How Low Can They Go?

AUTHOR(S)
Hansen, Teresa
PUB. DATE
August 2008
SOURCE
Power Engineering;Aug2008, Vol. 112 Issue 8, p44
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the decline in nuclear power plant outage duration in the U.S. It states that according to the Nuclear Energy Institute (NEI), 41 reactors were either completed or undergoing refueling outages at the end of April 2008 and the average duration of these outages was 36.7 days. It mentions that data from the NEI showed that the average refueling outage lasted 104 days in 1990 and that figure shrunk to 40 days in 2007. Chris Vlahoplus, partner with ScottMadden Inc., a general management consulting firm that specializes in the energy industry, says the bar has been raised when it comes to outage duration and efficiency. Aside from the reduction in average refueling outage duration, there is also a reduction in steam generator and reactor head replacement.
ACCESSION #
33832795

Tags: NUCLEAR facilities;  NUCLEAR reactors;  NUCLEAR power plants;  NUCLEAR engineering;  NUCLEAR Energy Institute (Organization);  VLAHOPLUS, Chris;  SCOTTMADDEN Inc.

 

Related Articles

  • Advanced Plants for Nuclear Power's Renaissance. Cleveland, John // Nuclear Plant Journal;Sep/Oct2005, Vol. 23 Issue 5, p50 

    Summarizes nuclear power's status and potential, means for achieving very competitive economics, very high safety levels and proliferation resistance for advanced plants. Overview of global development of advanced plants, including non-power applications; International initiatives; Global trends...

  • OPERATION & MAINTENANCE.  // Ecologist;Jul/Aug2006, Vol. 36 Issue 6, p49 

    The article offers information on the operation and maintenance of nuclear power plants. Nuclear power stations work in the same way as fossil fuel-burning stations, except that a chain reaction inside a nuclear reactor makes the heat instead. Thousands of staffs are employed to run nuclear...

  • Deterministic Safety Technology for RBMK Reactors. D'Auria, F.; Soloviev, S.; Mazzini, D.; Sollima, C. // Science & Technology of Nuclear Installations;2008, p1 

    The article provides an overview on the development of computational tools and codes to analyze transients in the RBMK nuclear power plant (NPP under the TACIS Project. It reveals that the codes aim to address the factors that may result to accidents involving RBMK reactors, including pressure...

  • INTEGRATED NUCLEAR DATA UTILISATION SYSTEM FOR INNOVATIVE REACTORS. Yamano, N.; Hasegawa, A.; Kato, K.; Igashira, M. // Radiation Protection Dosimetry;2005, Vol. 115 Issue 1-4, p126 

    A five-year research and development project on an integrated nuclear data utilisation system was initiated in 2002, for developing innovative nuclear energy systems such as accelerator-driven systems. The integrated nuclear data utilisation system will be constructed as a modular code system,...

  • NUCLEAR PLANT OVERHAUL. Keller, George; North American Services Group; AeroGo // Power;Jul2007, Vol. 151 Issue 7, p13 

    The article reports that the replacements of the steam generators (SGs) of nuclear power plants have become commonplace in the U.S. According to the Nuclear Energy Institute, a total of 132 SG replacements have been performed at 32 plant sites, including 11 in 2006. Most SG replacement projects...

  • Ling Ao Nuclear Power Station, Longgang District, Shenzhen, Guangdong Province, China. Neville, Angela // Power;Nov2011, Vol. 155 Issue 11, p32 

    The article presents information on Ling Ao Nuclear Power Station, located in Longgang District of Shenzhen, Guangdong Province in China. The nuclear unit is owned by Ling Ao Nuclear Power Co. Ltd. and operated by China Guangdong Nuclear Power Co. (CGNPC). The plant's four units are divided...

  • South Texas study.  // East Bernard Express (TX);8/10/2006, Vol. 63 Issue 33, p3 

    The article reports on the plan to build nuclear reactor plants in Bay City, Texas. In line with the plan to build more reactors, city officials reviews statistics from the South Texas Project construction.

  • Safety teams move in on Eastern Europe's nuclear plants.  // New Scientist;10/6/90, Vol. 128 Issue 1737, p19 

    Reports on the formation of teams of nuclear engineers by the International Atomic Energy Agency to improve the safety of nuclear power plants in central and eastern Europe. Concern over operating and design problems associated with nuclear reactors; Inspection of ageing nuclear plant in...

  • NUCLEAR PLUS. Tucker, William // American Enterprise;May2006, Vol. 17 Issue 4, p37 

    Provides information on the operations of Cooper Nuclear Station in Brownville, Nebraska. Problem of Cooper on the probable cost of replacement for nuclear reactors; Refueling schedule of Coopper every 18 months; Base load carried by the nuclear plant.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics