ABSTRACT
This paper estimates short- and long-run marginal production costs and returns to scale in electric power generation in the United States. We find substantial short-run diseconomies of scale at high output levels. A relatively large number of small and mid-sized firms have optimal capital stocks below actual levels. In contrast, several large firms have optimal capital stock targets substantially above current levels. These disparities in actual and optimal capital suggest a possible consolidation in the industry.
ACCESSION #
3016133

 

Related Articles

  • Electric Reliability For the People. Xiaozheng, Hu // Transmission & Distribution World;Jun2000, Vol. 52 Issue 6, p70 

    Focuses on the electric power distribution in China. Issues on the market economy of the electricity industry in China; Review of the 1998 10-kilovolt system for thirty cities; Improvements in the system performance in 1998.

  • Regional Factbook.  // Electrical Wholesaling;Nov99, Vol. 80 Issue 11, p34 

    Presents information on the performance of the electric power distribution business in the United States as of November 1999. Sales; Employment.

  • Eastern utilities form transmission group. Hoske, Mark T. // Electric Light & Power;Apr93, Vol. 71 Issue 4, p2 

    Reports on the agreement among members of the New England Power Pool (NEPOOL) on rules governing access and additions to New England's transmission grid. Permission for power suppliers to provide wholesale service to all utilities; Access based on a standard formula for computing the cost of...

  • ELMÅ°, ÉMÁSz announce winners of HUF 48 billion tender.  // Hungary A.M.;4/8/2014, p3 

    The article reports on the announcements of the network units of regional electricity distributors ELMŰ and ÉMÁSz regarding the 15 winners in a Hungarian Forint (HUF) 48 billion maintenance tender.

  • Is competitive power delivery next?  // Electrical World;Nov/Dec2000, Vol. 214 Issue 6, p7 

    Reports that a group of large-scale real estate developers in Massachusetts is supporting a proposal by state regulators to allow competition among providers of electric wires and poles, but only in areas where electric distribution infrastructure does not already exist. Massachusetts...

  • Tackling Argentina's distribution system.  // International Power Generation;Nov/Dec2000, Vol. 23 Issue 10, p21 

    Focuses on the distribution system of Argentina's electric power industry. Problems facing electricity distributors; Issues facing the competitive market.

  • T&D projects.  // Electrical World;Oct94, Vol. 208 Issue 10, p11 

    Presents information on current transmission and distribution projects of the electric industries in the United States as of October 1994. Preplanning stages for the construction of Citizens Utility Co.'s substation; Expansion plans of Baltimore Gas & Electric Co.'s Ivy Hill substation; PECO...

  • Managing Electricity Reliability Risk Through the Forward Markets. Siddiqui, Afzal // Networks & Spatial Economics;Jun2003, Vol. 3 Issue 2, p225 

    In competitive electricity markets, the vertically integrated utilities that were responsible for ensuring system reliability in their own service territories, or groups of territories, often cease to exist. Typically, the burden falls to an independent system operator (ISO) to ensure that...

  • Industrial customers know more than you think they do. Newton, Chuck // Transmission & Distribution World;Aug98, Vol. 50 Issue 8, p16 

    Opinion. Claims that energy managers at several industrial sites are knowledgeable in industrial power distribution technology. Ability to determine the distribution technologies that best meet their needs; Collaboration with manufacturers of electrical distribution and control equipment and...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics