TITLE

The AM--GM Inequality

AUTHOR(S)
Hirschhorn, Michael D.
PUB. DATE
September 2007
SOURCE
Mathematical Intelligencer;Fall2007, Vol. 29 Issue 4, p7
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
A mathematical calculation for the AM-GM (arithmetic mean-geometric mean) inequality is presented.
ACCESSION #
27575909

 

Related Articles

  • Common Pediatric Medications.  // Pediatric Dentistry;2010 Reference Manual, Vol. 32 Issue 6, p324 

    The article presents a chart with dosage information for several antibiotics and analgesics.

  • Supplementary Information: Trends and ENSO/AAO Driven Variability in NDVI Derived Productivity and Phenology alongside the Andes Mountains. Remote Sensing 2013, 5, 1177-1203.  // Remote Sensing;Mar2013, Vol. 5 Issue 3, p1 

    Several tables are presented related to vegetation productivity and phenology based on normalized difference vegetation index (NDVI) in the Andes Mountains, such as the areal coverage, annual mean's positive and negative changes, and NDVI summary.

  • E-Rate Averages.  // Tech & Learning;Feb2008, Vol. 28 Issue 7, p7 

    A diagram is presented which shows the average E-rate discount rates by category, based on the 23,000 school district funding request of the 2007 Funding Year.

  • Charting Safety Performance. Prevette, Steven S. // Professional Safety;May2006, Vol. 51 Issue 5, p34 

    Several charts are presented showing safety performance statistics and rate calculations depicted on January 2003 to May 2005 monthly injuries rates, monthly injuries moving average, and monthly injuries control chart.

  • X-BAR CHART.  // Encyclopedia of Operations Research & Management Science;2001, p889 

    The entry presents a definition of the term x-bar chart. It is described as a quality control chart that shows the variations in the averages of samples.

  • Leaders in Total Auto Loans Outstanding.  // Credit Union Times;8/17/2011, Vol. 22 Issue 31, p8 

    Several tables are presented related to outstanding credit union leaders in total auto loans including average for all CU's under 50 million dollars, average for all CU's with 50 to 150 million dollars, and average for all CU's with 150 to 500 million dollars.

  • Weekend at the B. O.  // Daily Variety;1/8/2013, Vol. 318 Issue 2, p9 

    Several tables and graphs related to the U.S. weekend box office (B.O.) from January 4-6, 2013 are presented including one on the top five per engagement averages, another regarding the comparison of the 2012 and 2013 B.O., and one on the estimated B.O. in millions.

  • Weekend at the B.O.  // Daily Variety;10/16/2012, Vol. 317 Issue 12, p16 

    Several charts and graphs related to film box office (BO) in New York City for the weekend October 12-14, 2012 including one on the top five per engagement averages, another regarding the estimated BO, and one on the year-to-date BO in 2011 and 2012.

  • Continuous Extension of Arithmetic Volumes. Moriwaki, Atsushi // IMRN: International Mathematics Research Notices;Oct2009, Vol. 2009 Issue 19, p3598 

    This article is the sequel of the article [4], in which we established the arithmetic volume function of C8-hermitian -invertible sheaves and proved its continuity. The continuity of the volume function has a lot of applications as treated in [4]. In this article, we would like to consider its...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics