TITLE

Most manufacturers don't know the cost of engineering change orders, survey finds

PUB. DATE
June 2007
SOURCE
Trailer / Body Builders;Jun2007, Vol. 48 Issue 8, p20
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article discusses the findings of the survey "Best Practices: Mass Customization and Build-to-Order Manufacturing," conducted by software maker Cincom Systems in 2007. More than half of the respondents believe they can charge a 10% or higher premium with a product customization strategy. The survey also shows that while 73% of total respondents see product customization as critical for products over $100,000, 25% also see them as critical for products under $1,000.
ACCESSION #
26183565

 

Related Articles

  • Survey: Customer value as top priority just lip service in most IT departments.  // Trailer / Body Builders;Jul2008, Vol. 49 Issue 9, p20 

    The article reports that 85% of information technology managers surveyed ranked are becoming customer value-driven thereby reducing costs and introducing new technology as their priorities. It explains that while these could be met with a knowledge-management system, the latter ranked last in...

  • Design Upgrades.  // Product Design & Development;Mar2008 Supplement, Vol. 63, p16 

    The article focuses on the survey that explores the challenges facing product design updates. It describes how the projects impact the use of new or different distributors and suppliers. According to the survey's responses, the most significant challenges to updating designs are the integration...

  • Understanding the perceived value of mass customization: the distinction between product value and experiential value of co-design. Merle, AurĂ©lie; Chandon, Jean-Louis; Roux, Elyette // Recherche et Applications en Marketing (English Edition) (AFM c/;2008, Vol. 23 Issue 3, p27 

    Research on mass customization suggests that this type of offer delivers more value to the customet However, the failures of mass-customization strategies tend to prove the contrary. This article provides answers to the following research questions: (1) Why and to what extent do consumers value...

  • Green design methods based on Product Configuration. Zhiyong Dai; Minghai Yuan; Shuo cheng; Aimin Ji // Applied Mechanics & Materials;2014, Issue 543-547, p320 

    According to the overseas and domestic researches on green design and mass customization, this paper does research on green product configuration design method based on the three configuration algorithms, and proposes a new product configuration method aiming at realizing the goal of green...

  • Total framework links business process apps. Vadlamudi, Pardhu // InfoWorld;12/11/95, Vol. 17 Issue 50, p12 

    Reports that Cincom Systems Incorporated will deliver a development environment that provides the basic ingredients for IS shops to produce business process applications.

  • Cincom cuts price of Supra database SDK.  // InfoWorld;8/22/94, Vol. 16 Issue 34, p21 

    Reports on Cincom Systems Inc.'s decision to cut the federal government price of its Supra database server developer's kit (NT or OS/2 version).

  • New Tools for Mass Customization: 2D/3D Body Mapping. Domina, Tanya; Kinnicutt, Patrick; MacGillivray, Maureen; Lerch, Terry // AATCC Review;Jan2009, Vol. 9 Issue 1, p38 

    The article discusses a university research project that explored different clothing and mass customization design issues that interface with the human body, using a three dimensional body scanner and a thermal camera. How the project created a thermal database containing thermal profiles and...

  • DIGITAL PRINTING ON TEXTILES: PRACTICAL APPLICATION FOR RAPID PROTOTYPING AND MASS CUSTOMIZATION. Istook, Cynthia L. // Proceedings of the Annual International Conference & Exhibition ;2001, p364 

    The article explores the nature of rapid prototyping and mass customization of digital printing on textiles. Rapid prototyping is the ability to conceive a design idea and see a physical creation of that idea in a very short period of time while mass customization places limitations on the...

  • Cincom Systems Inc. C.F. // Software Magazine;Jul96, Vol. 15 Issue 7, p109 

    Reports on the financial performance of Cincom Systems Inc. in 1995. Ranking in `Software' magazine's 1996 Software 100 Performance Index; Joint research and development agreement with UniSQL; Increase in total corporate revenue; Sale and support of packaged software; Spending on sales and...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics