TITLE

Joint Strike Fighter: Progress Made and Challenges Remain: GAO-07-360

AUTHOR(S)
Sullivan, Michael J.
PUB. DATE
March 2007
SOURCE
GAO Reports;3/15/2007, p1
SOURCE TYPE
Government Documents
DOC. TYPE
Article
ABSTRACT
The Joint Strike Fighter (JSF) program--a multinational acquisition program for the Air Force, Navy, Marine Corps, and eight cooperative international partners--is the Department of Defense's (DOD) most expensive aircraft acquisition program. DOD currently estimates it will spend $623 billion to develop, procure, and operate and support the JSF fleet. The JSF aircraft, which includes a variant design for each of the services, represents 90 percent of the remaining planned investment for DOD's major tactical aircraft programs. In fiscal year 2004, the JSF program was rebaselined to address technical challenges, cost increases, and schedule overruns. This report--the third mandated by Congress--describes the program's progress in meeting cost, schedule, and performance goals since rebaselining and identifies various challenges the program will likely face in meeting these goals in the future. The JSF program has delivered and flown the first development aircraft. However, cost and schedule goals established in the fiscal year 2004 rebaselined program have not been met. Total JSF program acquisition costs (through 2027) have increased by $31.6 billion and now DOD will pay 12 percent more per aircraft than expected in 2004. The program has also experienced delays in several key events, including the start of the flight test program, delivery of the first production representative development aircraft, and testing of critical missions systems. Delays in the delivery of initial development aircraft were driven by incomplete engineering drawings, changes in design, manufacturing inefficiencies, and parts shortages. Despite these delays, the program still plans to complete development in 2013, compressing the amount of time available for flight testing and development activities. Also, the program projects it will meet all but one key performance requirement--line of sight communications--that is currently dependent on other capabilities being developed outside the JSF program. Accurately predicting JSF costs and schedule and ensuring sufficient funding will likely be key challenges facing the program in the future. JSF continues to pursue a risky acquisition strategy that concurrently develops and produces aircraft. While some concurrency may be beneficial to efficiently transition from development to production, the degree of overlap is significant on this program. Any changes in design and manufacturing that require modifications to delivered aircraft or to tooling and manufacturing processes would result in increased costs and delays in getting capabilities to the warfighter. Low-rate initial production will begin this year with almost the entire 7-year flight test program remaining to confirm the aircraft design. Confidence that investment decisions will deliver expected capability within cost and schedule goals increases as testing proves the JSF will work as expected. The JSF program also faces funding uncertainties as it will...
ACCESSION #
24583848

 

Related Articles

  • News Breaks.  // Aviation Week & Space Technology;3/19/2007, Vol. 166 Issue 12, p84 

    This article reports that total acquisition costs for the F-35 Joint Strike Fighter (JSF) program through 2027 have increased, according to the Government Accountability Office (GAO). The Defense Department will pay 12% more per aircraft than expected in fiscal 2004, when the program was...

  • Military Readiness: DOD Needs to Identify and Address Gaps and Potential Risks in Program Strategies and Funding Priorities for Selected Equipment: GAO-06-14. Solis, William M. // GAO Reports;10/26/2005, p1 

    Presents the findings of the U.S. Government Accountability Office on the military readiness of the country. Detection of the decline in the readiness due to the continued high use of equipment to support current operations and maintenance issues caused by the advancing ages and complexity of...

  • Program Generally Stable but Improvements in Managing Schedule Are Needed.  // GAO Reports;2/27/2013, preceding p1 

    The article presents the study of the Government Accountability Office (GAO) that investigates the performance of the KC-46 program of the U.S. military. The agency reviewed its development schedule, program plans, performance goals and key documents. It discovered that the KC-46 program is...

  • High-Level Leadership Needed to Help Guam Address Challenges Caused by DODRelated Growth. Lepore, Brian J. // GAO Reports;4/9/2009, p1 

    The article presents the report of the U.S. Government Accountability Office (GAO) on a much needed high-level leadership to help Guam address the challenge caused by the Department of Defense (DOD)-related growth. It cites DOD's plan to relocate more than 8,000 marines to Guam in an effort to...

  • GAO: DOD SHOULD IMPROVE URGENT NEEDS PROCESS.  // Journal of Electronic Defense;Apr2011, Vol. 34 Issue 4, p24 

    The article looks at the U.S. Government Accountability Office report "Warfighter Support - DOD'S Urgent Needs Processes Need a More Comprehensive Approach and Evaluation for Potential Consolidation." The report states that DOD has invested 76 billion dollars for urgent needs procurements from...

  • GAO Cites Challenges In DoD Cyber Activities. Biesecker, Calvin // Defense Daily;7/25/2011, Vol. 251 Issue 17, p6 

    The article offers information on a report by the U.S. Government Accountability Office (GAO), according to which the U.S. Defense Department (DoD) hasn't completed a comprehensive assessment for closing its cyber vulnerabilities. GAO states the measures of DoD to combat cyber threat including,...

  • OPERATION IRAQI FREEDOM: Actions Needed to Enhance DOD Planning for Reposturing of U.S. Forces from Iraq. Solis, William M. // GAO Reports;9/10/2008, preceding p1 

    The article discusses a report which examines the status of logistical planning for reposturing U.S. armed forces from Iraq by the U.S. Department of Defense. The examination was done by the U.S. Government Accountability Office (GAO) under the U.S. Comptroller General's Authority. The GAO has...

  • Pentagon Workforce Cuts May Not Achieve Savings, GAO Warns. Clark, Charles S. // Government Executive;1/4/2016, p1 

    The article reports that the U.S. Government Accountability Office (GAO) has said that Defense Department couldn't document budgetary savings associated with cuts in its civilian and contractor workforces.

  • Planning Challenges Could Increase Risks for DOD in Providing Utility Services When Needed to Support the Military Buildup on Guam. Lepore, Brian J. // GAO Reports;7/30/2009, preceding p1 

    The article presents a study which examines the condition and capacity of the existing utilities infrastructure on Guam island to support the increase in the current U.S. military population. It was conducted by the U.S. Government Accountability Office (GAO). The study recommends that the U.S....

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics