TITLE

Defense Acquisitions: Issues Concerning Airlift and Tanker Programs: GAO-07-566T

AUTHOR(S)
Sebastian, Steven J.
PUB. DATE
March 2007
SOURCE
GAO Reports;3/8/2007, p1
SOURCE TYPE
Government Document
DOC. TYPE
Article
ABSTRACT
The Department of Defense (DOD) has continuing efforts to modernize its airlift and tanker fleets by investing billions of dollars to modify legacy airlift systems, such as the C-5 and C-130, and procure new aircraft, such as a tanker replacement. Acquisition has been on GAO's list as a high risk area since 1990. GAO has reported that elements contributing to a sound business case for an acquisition are missing or incomplete as DOD and the services attempt to acquire new capabilities. Those elements include firm requirements, mature technologies, a knowledge-based acquisition strategy, a realistic cost estimate, and sufficient funding. Acquisition problems that include failure to limit cost growth, schedule delays, and quantity reductions persist, but fiscal realities will not allow budgets to accommodate these problems any longer. Today's testimony addresses (1) the analyses supporting the Department of Defense's (DOD) mobility capabilities and requirements and (2) actions that are needed to improve the outcomes of weapon system acquisitions. For this testimony, GAO drew from issued reports, containing statements of the scope and methodology used, as well as recently completed work not yet reported. GAO's work was performed in accordance with generally accepted government auditing standards. Past GAO reports, including two recently issued, raise concerns about the quality of analyses underpinning the programmatic decision-making surrounding DOD's airlift requirements. In September 2006, GAO issued our report (GAO-06-938) on DOD's Mobility Capabilities Study (MCS). The MCS determined that the projected mobility capabilities are adequate to achieve U.S. objectives with an acceptable level of risk during the period from fiscal years 2007 through 2013; that is, the current U.S. inventory of aircraft, ships, prepositioned assets, and other capabilities are sufficient, in conjunction with host nation support. GAO's report stated that conclusions of the MCS were based on incomplete data and inadequate modeling and metrics that did not fully measure stress on the transportation system. GAO further observed that the MCS results were incomplete, unclear, or contingent on further study, making it difficult to identify findings and evaluate evidence. It was not clear how the analyses done for the study support DOD's conclusions and GAO suggested that decision makers exercise caution in using the results of this study to make programmatic decisions. In March 2007, GAO reported (GAO-07-367R) on the lack of mandatory analyses to support a passenger and cargo capability for the new replacement refueling aircraft, the KC-X tanker. Contrary to mandatory Air Force implementing guidance, the Air Force proposed a capability without analyses identifying an associated gap, shortfall, or redundancy. GAO believes that without sound analyses, the Air Force may be at risk of spending several billion dollars unnecessarily for a capability that may not be...
ACCESSION #
24583821

 

Related Articles

  • Planning Ahead in the Department of Defense. Novick, David // California Management Review;Summer63, Vol. 5 Issue 4, p35 

    This article describes a new planning and programming process that was initiated within the Department of Defense in early 1961. The significant feature of this process is the approach that is taken to decision-making and control in the vital area of defense expenditures. Planning is considered...

  • DOT&E Calls For More Upfront Investment To Improve Weapons Reliability. Sirak, Michael // Defense Daily;10/23/2007, Vol. 236 Issue 17, p3 

    This article reveals that the U.S. Department of Defense's chief operational tester Charles McQueary is advocating that the services invest more upfront to improve the reliability of new weapons systems so that the costs of maintaining them over their lifetime will be much less. While the...

  • Administration agrees to resupply Israeli munitions used during war with Hizbullah.  // Geo-Strategy Direct;9/12/2007, p16 

    The article reports that the administration of U.S. George W. Bush approved an Israeli request for air munitions meant to replenish military arsenals depleted during the war in Lebanon. The U.S. Defense Department has notified the U.S. Congress of a proposed U.S. sale of munitions and weapon...

  • A Better Cost-Estimating Tool. Young, Mike; Markley, Ted // Defense AT&L;Jul/Aug2008, Vol. 37 Issue 4, p24 

    The article reports on the U.S. Department of Defense (DoD) new weapons systems significant underestimations of costs in the U.S. The author claims that DoD weapons systems and program developments have received considerable unwanted attention because of the rising costs concern those who...

  • 2003 MAINTENANCE AWARD WINNERS ANNOUNCED.  // Program Manager;Sep-Dec2003, Vol. 32 Issue 5, p69 

    Reports on the U.S. Department of Defense's announcement of the recipients of the 2003 Defense Maintenance Awards. Recognition of outstanding achievements in military equipment and weapon systems maintenance by organizations of the military services; Presentation of awards in the categories of...

  • Major Systems Acquisitions. Lawson, Marci A. // Army Lawyer;Jan2007, Issue 404, p133 

    The article discusses the report issued by the U.S. Government Accountability Office (GAO) regarding the failure of the country's Department of Defense to obtain sufficient data rights for the major systems acquisitions of weapons. The said report has been based on the objective of GAO which is...

  • Choose Your Weapons, Gentlemen. Burnham, James // National Review;10/15/1976, Vol. 28 Issue 39, p1110 

    The article comments on the U.S. Department of Defense's description of the advantages of their weapons systems. The factors considered when making decisions about major weapons are enumerated. The idea that the Right more or less automatically objects to any proposal to reduce the agency's...

  • Effect of Continuing Weaknesses on Management and Operations and Status of Key Challenges. Khan, Asif A. // GAO Reports;5/13/2014, preceding p1 

    The article focuses on a study conducted by the Government Accountability Office (GAO), an investigative arm of the U.S Congress, to examine the impact of weak financial management on the operations of the U.S Department of Defense to its financial management. Topics discussed include inaccurate...

  • A Model for Managing Decision-Making Information in the GIG-Enabled Battlespace. Bass, Samuel D.; Baldwin, Rusty O. // Air & Space Power Journal;Summer2007, Vol. 21 Issue 2, p100 

    The article focuses on the transformation of information-technology systems into a Global Information Grid (GIG) to used in the battlespace. The U.S. Defense Department is pursuing this to link sensors to weapons systems and provide unprecedented situational awareness. It serves as a response to...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics