Prepositioned military equipment and supplies on ships and overseas on land have become an integral part of the U.S. defense strategy. However, the Army's program has faced long-standing management challenges, including equipment excesses and shortfalls, invalid or poorly defined requirements, and maintenance problems. In Public Law 109-163, Congress required the Army to conduct an assessment of its prepositioning programs and required GAO to assess (1) whether the Army's report addressed the areas required by Congress, and (2) the major challenges the Army continues to face in its prepositioning program. GAO analyzed the Army's report and other information it obtained from the Joint Staff, the Army, and its subordinate commands to identify the issues affecting the Army's prepositioning program. GAO also visited prepositioned equipment sites in South Carolina, Europe, South Korea, and Kuwait. The Army's April 2006 report on the status of its prepositioning program addressed the areas required by Congress; for example, it included descriptions of operational capabilities, as well as inventory shortfalls expressed in terms of procurement costs. However, the Army significantly shifted its prepositioning strategy in the latter part of 2006, since that report was issued. According to the Army, this shift was based on insights gained from the 2006 Quadrennial Defense Review, but Army officials told us that budget reprogramming decisions and worsening Army-wide equipment shortfalls also influenced the expedited strategy revision. The Army's revised strategy proposes less reliance on heavy combat equipment afloat and the expansion of heavy equipment in Kuwait and Italy. As a result, the Army's April 2006 report to Congress is outdated, and neither Congress nor DOD should base funding decisions on it. The Army faces several major strategic and management challenges as it revises and implements its prepositioning program. From a strategic perspective, the Army cannot gauge how well its emerging strategy will align with DOD plans currently under development. The Army plans to begin implementing its revised strategy by the end of 2006. DOD has a departmentwide prepositioning study underway intended to set strategy and joint doctrine, but this will not be completed for several months and it anticipates that the Army will have to modify its prepositioning strategy when the DOD-wide strategy is issued. As a result, the Army is at risk of resourcing requirements that may be superseded by the DOD strategy. Moreover, because prepositioning is linked to airlift, sealift, and basing, the Army's decisions will have an as-yet undetermined effect on these areas. In addition to these strategic concerns, the Army faces three key management challenges. First, the Army has yet to determine sound secondary item and operational project stock requirements, and to systematically measure and report readiness. While the Army has been taking steps to address...
ACCESSION #
24272519

 

Related Articles

  • Export Controls: GAO-08-710T. Barr, Ann Calvaresi // GAO Reports;4/24/2008, p1 

    In controlling the transfer of weapons and related technologies overseas, the U.S. government must limit the possibility of sensitive items falling into the wrong hands while allowing legitimate trade to occur. Achieving this balance has become more challenging due to redefined security...

  • Defense Acquisitions: Status and Challenges of Joint Forces Command's Limited Acquisition Authority: GAO-07-546.  // GAO Reports;4/13/2007, p1 

    Over 3 years ago, Congress granted limited acquisition authority (LAA)--subject to delegation by the Secretary of Defense--to U.S. Joint Forces Command (JFCOM) for a 3-year period to expedite development and acquisition of certain warfighter equipment. Congress directed GAO to report on JFCOM...

  • DOD Must Prioritize Its Weapon System Acquisitions and Balance Them with Available Resources. Sullivan, Michael J. // GAO Reports;3/18/2009, preceding p1 

    The article offers information on a study conducted by the U.S. Government Accountability Office (GAO) regarding the Department of Defense's (DOD) supervision of its major weapon acquisitions. It states that the program failed to present capabilities and the continued cost growth leads to less...

  • Ongoing Challenges in Implementing the Financial Improvement and Audit Readiness Plan. Khan, Asif A. // GAO Reports;9/15/2011, preceding p1 

    The article presents a report from the U.S. Government Accountability Office (GAO) on the efforts of the Department of Defense (DOD) on the implementation of its Financial Improvement and Audit Readiness (FIAR) Plan. It notes that the implementation of the plan is intended to help improve...

  • Defense Acquisitions: Assessments of Selected Major Weapon Programs: GAO-06-391.  // GAO Reports;4/3/2006, p1 

    In the last 5 years, the Department of Defense (DOD) has doubled its planned investments in new weapon systems from about $700 billion in 2001 to nearly $1.4 trillion in 2006. While the weapons that DOD develops have no rival in superiority, weapon systems acquisition remains a long-standing...

  • Reports & Testimonies.  // GAO Reports;4/24/2008, p1 

    The Department of Defense (DOD) manages and operates about 577,000 structures worldwide, valued at about $712 billion. DOD has worked for several years to develop models that can reliably estimate the installation support funds needed to sustain these facilities, and plans to spend over $55...

  • Defense Management: Key Elements Needed to Successfully Transform DOD Business Operations: GAO-05-629T. Walker, David M. // GAO Reports;4/28/2005, p1 

    In addition to external security threats, our nation is threatened from within by growing fiscal imbalances. The combination of additional demands for national and homeland security resources, the long-term rate of growth of entitlement programs, and rising health care costs create the need to...

  • DoD Needs To Assess requirement For Critical Technologies List, Report Says. Roosevelt, Ann // Defense Daily;1/23/2013, Vol. 257 Issue 15, p4 

    The article offers information on a report by the U.S. Government Accountability Office (GAO), which urges the U.S. Department of Defense (DoD) to assess its list of critical technologies. It states that according to GAO, DoD spends billions of dollars on its weapons and technologies to maintain...

  • Pentagon Workforce Cuts May Not Achieve Savings, GAO Warns. Clark, Charles S. // Government Executive;1/4/2016, p1 

    The article reports that the U.S. Government Accountability Office (GAO) has said that Defense Department couldn't document budgetary savings associated with cuts in its civilian and contractor workforces.