TITLE

ARIZONA

PUB. DATE
December 2006
SOURCE
ENR: Engineering News-Record;12/11/2006, Vol. 257 Issue 23, p68
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports that Ninyo & Moore has retained its contract with Achen-Gardner to provide construction quality control services during improvements of Gilbert Road in Chandler, Arizona. The construction project includes the removal and replacement of about three miles of asphalt pavement, including curb, gutter and sidewalk improvements along Gilbert Road.
ACCESSION #
23716292

 

Related Articles

  • Getting there.  // American City & County;Jul2008, Vol. 123 Issue 7, p16 

    The article offers news briefs on U.S. cities and counties. San Leandro, California has contracted with Ninyo & Moore to provide geotechnical consulting services on the city's Eden Road expansion project. Hillsborough County, Florida has contracted with PB to consult on engineering and inspect...

  • If you build it . . .  // American City & County;Jan2004, Vol. 119 Issue 1, p16 

    Presents construction contracts awarded to several companies by U.S. counties and cities as of January 2004. Service contract awarded to Ninyo & Moore by the local government of Coronado, California; Construction contract awarded to Boyken International by Savannah, Georgia.

  • CALIFORNIA.  // ENR: Engineering News-Record;1/22/2007, Vol. 258 Issue 3, p47 

    This article reports on the retention of the Ninyo & Moore-Terra Engineers Inc. joint venture by the East Bay Municipal Utility District to provide geotechnical engineering design and construction services for the seismic upgrade of San Pablo Dam in Contra Costa County, California. Construction...

  • Pulse.  // ENR: Engineering News-Record;7/5/2004, Vol. 253 Issue 1, p54 

    This article presents news briefs, related to the construction industry, as of November 2003. Ninyo & Moore Geotechnical, has been retained to provide a geotechnical evaluation for the design of the proposed improvements to the North Campus 12-kv switching station at the University of California...

  • Pulse.  // ENR: Engineering News-Record;5/4/2009, Vol. 262 Issue 14, p49 

    This article presents updates related to construction contracts, bids and proposals in the U.S. Ninyo & Moore was chosen by Carollo Engineers to perform a geotechnical evaluation of the design and expansion of the San Luis Rey reclamation treatment plant. James G. Davis Construction Corp. has...

  • Ninyo & Moore Land Reservoir Project.  // San Diego Business Journal;11/1/99, Vol. 20 Issue 44, p36 

    Reports on the hiring of Ninyo & Moore Geotechnical and Environmental Sciences Consultants to perform geotechnical services for the Otay Water District in San Diego, California.

  • PULSE.  // ENR: Engineering News-Record;3/3/2003, Vol. 250 Issue 8, p37 

    Presents news briefs related to the construction industry of the U.S. as of March 3, 2003. Completion of geotechnical services for the proposed Conventional Center Hotel parking facility located in downtown San Diego, California by Ninyo & Moore Geotechnical; Selection of Hardin Construction...

  • ARIZONA.  // ENR: Engineering News-Record;8/21/2006, Vol. 257 Issue 8, p51 

    This article reports on the decision of Mayo Clinic Hospital to retain Ninyo & Moore to provide materials testing and special inspection services for the new projects at its hospital in Phoenix, Arizona. The projects include a new employee childcare facility and an expansion of the existing...

  • Firm hired to assist in tank removals.  // San Diego Business Journal;01/11/99, Vol. 20 Issue 2, p23 

    Reports on the selection of Ninyo and Moore Geotechnical by the San Diego County Water Authority in California to provide assistance in underground storage tank removals.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics