TITLE

Truss Design at Issue

PUB. DATE
December 2006
SOURCE
ENR: Engineering News-Record;12/18/2006, Vol. 257 Issue 24, p1
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article comments on the contract awarded by the Nevada Department of Transportation (NDOT) to Edward Kraemer and Sons Inc. to finish the Galena Creek Bridge, part of the Interstate 580 freeway extension between Reno and Carson City. It cites the actions taken by the NDOT to address the problems with the wind loadings used to design the steel pilot truss. It states the reasons of the two parties for entering into a Mutual No-Fault Termination Agreement.
ACCESSION #
23625372

 

Related Articles

  • Ford Parkway Bridge.  // Construction Bulletin;11/5/2004, Vol. 288 Issue 6, p6 

    Reports on the rehabilitation work on the bridge linking Minneapolis with Saint Paul in Minnesota. Original structure of the bridge; Minnesota Department of Transportation's hiring of Edward Kraemer and Sons Inc. to restore the bridge to its original structure; Structural engineering description...

  • Permit.  // World Wastes;Jun97, Vol. 40 Issue 6, p11 

    Reports that Arid Operations has been granted a solid waste facility permit by the California Integrated Waste Management Board, and that Edward Kraemer & Sons Inc. received a permit to accept construction and a demolition waste at three expansion areas designed for solid waste.

  • FHWA awards $30.1 million Hoover Dam Bridge contract.  // Las Vegas Business Press;9/29/2003, Vol. 20 Issue 39, p25 

    Reports on the multi-million second phase of the Hoover Dam Bypass Bridge project by Edward Kraemer & Sons Inc. of Plain, Wisconsin. Number of working days on the road construction; Value of the first-phase of the project; Expected date on the opening of the bridge.

  • Rutgers Gets Bridge Study Money. Gaudio, Thomas // njbiz;4/28/2008, Vol. 21 Issue 18, p2 

    The article reports that Rutgers University was awarded a contract worth $25.5 million by the federal government for a study on U.S. bridges and for a suggestion on how to better maintain and repair them. In May 2008, Rutgers' Center for Advanced Infrastructure and Transportation will start...

  • NJTA Awards $22M Bridge Contract.  // Journal of Protective Coatings & Linings;Sep2012, p70 

    The article reports that Allied Painting Inc. has won a contract to improve the Northbound Driscoll Memorial Bridge in Middlesex County, New Jersey.

  • Vimas to Recoat WV Hospital Bridge.  // Journal of Protective Coatings & Linings;Sep2012, p70 

    The article reports on the contract awarded to Vimas Painting Co. Inc. to recoat the bridge in Wheeling, West Virginia.

  • Group sells bonds and builds own bridge.  // ENR: Engineering News-Record;2/26/96, Vol. 236 Issue 8, p23 

    Reports on Missouri private businesses attempts fund the building of a bridge at the Lake of the Ozarks. Reasons for the construction of bridge; Environmental studies and design by HNTB Corporation, Kansas City, Missouri; Edward Kraemer & Sons Incorporation, Wisconsin, contractors; Relief of...

  • Tracks over trucks. Kuhar, Mark S. // Pit & Quarry;Jul2005, Vol. 98 Issue 1, p28 

    Explores aggregate producer Edward Kraemer & Sons Inc.'s use of customized mobile crusher in its quarry site in Burnsville, Minnesota. Limestone mined by the quarry site; Production problems at the quarry; Firm's selection of a mobile crusher from Metso Minerals to keep the steady flow of...

  • Department of Natural Resources (DNR): Notice of Availability of Contract for the Walnut Lake Bridge Replacement CERTIFICATION NUMBER: # 31663.  // Minnesota State Register;11/5/2012, Vol. 37 Issue 19, p738 

    The article informs that the Department of Natural Resources in Minnesota is requesting proposals from authorized body for remodeling of the walnut bridge located in Minnesota.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics