TITLE

Optimize Production Flow with Steel Manager III

PUB. DATE
July 2006
SOURCE
Metal Center News;Jul2006, Vol. 46 Issue 8, Special section p16
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article focuses on 4GL Solutions' Steel Manager III, an integrated production scheduling program. It allows the service center production staff to view and manipulate data in a variety of ways. Crucial fields besides the raw material that are displayed by the production schedule include the customer and the finished goods. Production costs are automatically monitored by Steel Manager III.
ACCESSION #
21800822

 

Related Articles

  • SCHEDULING TASKS WITH DUE DATES IN A FABRICATION/ASSEMBLY PROCESS. Faaland, Bruce; Schmitt, Tom // Operations Research;May/Jun87, Vol. 35 Issue 3, p378 

    In fabrication and assembly processes, end-product due dates play a significant role in scheduling tasks to minimize earliness and lateness penalties. We develop a heuristic technique for this problem that solves a sequence of maximum flow problems to identify improved schedules. This method...

  • A dynamic inventory-production scheduling model for small scale organisations. Hui, I. K.; Lau, H. C. W. // International Journal of Advanced Manufacturing Technology;Sep2003, Vol. 22 Issue 1/2, p89 

    A production scheduling model based on the minimisation of inventory costs is proposed for small scale organisations . This is an interactive model characterised by its ability to cope with continuous changes in production and demand conditions. The model is built on the foundation of the...

  • BRIEFS.  // Metal Center News;Jan2012, Vol. 52 Issue 1, p15 

    The article offers news briefs related to the metal industry in the U.S. 4GL Solutions is going to install Steel Manager III software at its Central Tube & Bar's Tulsa, Oklahoma facility. Turner Steel Co. Inc. has installed hEnmark Systems' Web Access Module to allow secure page assess to its...

  • Single-machine group scheduling problems with deteriorating jobs. Ji-Bo Wang; Lin Lin; Feng Shan // International Journal of Advanced Manufacturing Technology;Dec2008, Vol. 39 Issue 7/8, p808 

    This paper investigates single-machine scheduling problems with deteriorating jobs and the group technology (GT) assumption. By deteriorating jobs and the group technology assumption, we mean that the group setup times and job processing times are both increasing functions of their starting...

  • European companies behind schedule?  // Works Management;Jan1998, Vol. 51 Issue 1, p25 

    The article discusses five important questions asked about scheduling. First is how the capacity of a facility can accurately be determined. Second is what a good schedule is and how scheduling performance should be measured. Third is what should be done next when a machine or operator ends a...

  • Scheduling Management: Schedule Basis Memorandum. Stephenson, H. Lance // AACE International Transactions;2007, p18.1 

    The article focuses on schedule basis memorandum (SBM). It is a document that assists the project team in identifying key elements, issues, and considerations such as exclusions and serves as a basis for the project schedule development. Moreover, it substantiates the degree of completeness of...

  • CMMS SOLUTIONS. Singer, Tom // Industrial Maintenance & Plant Operation;Feb2004, Vol. 65 Issue 2, p30 

    Focuses on the low-cost Computerized Maintenance Management System software. Hoffman Innovations' preventive-maintenance management solution called CheckMaint that supports calendar and meter-based scheduling; Smartware Group's Smart Maintenance; Mpsis Software's Maintenance Manager which can...

  • Ä°KÄ° ÖLÇÜTLÃœ ZAMANA-BAÄžIMLI ÖĞRENME ETKÄ°LÄ° ÇİZELGELEME PROBLEMÄ°. Eren, Tamer // Suleyman Demirel University Journal of Faculty of Economics & Ad;2009, Vol. 14 Issue 1, p387 

    In traditional scheduling problems, most literature assumes that the processing time of a job is fixed. However, there are many situations where the processing time of a job depends on the starting time or the position of the job in a sequence. In such situations, the actual processing time of a...

  • Congratulations from Preactor to Silvergate Plastics.  // Works Management;Jul2007, Vol. 60 Issue 7, p40 

    The article acknowledges Silvergate Plastics for winning first place in the Plant Controls category of the MCS Best of British Manufacturing IT Awards in Great Britain. Silvergate has won the award for using Preactor's production planning and scheduling technology in its manufacturing business...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics