TITLE

Low-Energy Building Case Study: IAMU Office and Training Headquarters

AUTHOR(S)
McDougall, Tom; Nordmeyer, Kevin; Klaassen, Curtis J.
PUB. DATE
January 2006
SOURCE
ASHRAE Transactions;2006, Vol. 112 Issue 1, p312
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The Iowa Association of Municipal Utilities (IAMU) office and training headquarters is a pioneering building designed in 1997 that helped define and embody high-performance sustainable design on a speculative office building budget. This project was selected by the American Institute of Architect's National Committee on the Environment as one of its Top Ten Green Projects in the United States in 2002. For this 12,500 ft² (1,161 m²) office and training facility, effective interior daylighting became a main organizing element for the architectural concept. Sited along an east/west axis, the building uses primarily north and south window exposures with careful control of direct sunlight to provide a highly productive and comfortable workspace. A high-efficiency geothermal heating and cooling system, working with an energy recovery ventilation (ERV) unit, provides temperature and ventilation control to further enhance the building's energy performance. Systematic evaluation of building massing, orientations, window design options, and HVAC alternatives using daylighting and thermal simulation models led to a final design solution that uses 65% less site energy than an Iowa energy code-compliant (ANSI/ASHRAE/IESNA 90.1-1989) office building.
ACCESSION #
21489897

 

Related Articles

  • Dynamic Evaluation of the Cooling Capacity of Thermo-Active Building Systems. Olesen, B. W.; de Carli, M.; Scarpa, M.; Koschenz, M. // ASHRAE Transactions;2006, Vol. 112 Issue 1, p350 

    This paper offers a guide for the design of water-based embedded heating/cooling systems to promote the use of renewable energy sources and provide a method for actively integrating the building mass to reduce peak loads, transfer heating/cooling loads to off-peak times, and decrease system...

  • Assessing the Performance of a Naturally Ventilated Office Building. Walker, Christine E.; Norford, Leslie K.; Glicksman, Leon R. // ASHRAE Transactions;2006, Vol. 112 Issue 1, p281 

    This paper provides an overview of the performance of a low-energy, naturally ventilated building and an explanation of special methods required to assess it. Through monitoring, measuring, and observing a naturally ventilated office building in a temperate climate, we now have a better...

  • Evaluation of the Low-Energy Design Process and Energy Performance of the Zion National Park Visitor Center. Long, Nicholas L.; Torcellini, Paul A.; Pless, Shanti D.; Judkoff, Ron // ASHRAE Transactions;2006, Vol. 112 Issue 1, p321 

    In line with the mission of the National Park Service, the Zion National Park Visitor Center was designed to use 70% less energy than a comparable visitor center built to Federal Energy Code 10 CFR 435 (DOE 1995). The authors and NPS staff used an integrated design process, including extensive...

  • Portable Cooling: Equipment and Applications. Michel, Clark // Heating/Piping/Air Conditioning Engineering;Jun2010, Vol. 82 Issue 6, p10 

    The article focuses on the applications of portable cooling equipment for summer season. It states that air-cooled portable air conditioner, one of the three main types of portable equipment, discharge hot air through ductwork. It says that portable units offer flexibility to tenants who rent...

  • Combining Radiant and Convective Systems with Thermal Mass for a More Comfortable Home. Scheatzle, David // ASHRAE Transactions;2006, Vol. 112 Issue 1, p253 

    A residential radiant heating and cooling system has been operating and monitored in the Phoenix, Arizona, area for four years (2000–2004). It has demonstrated that controlling surface temperatures of both high and low mass envelope components can provide stable comfort conditions at a...

  • Controlling Moisture in Schools. Wilkinson, Ronald J. // Heating/Piping/Air Conditioning Engineering;Feb2005, Vol. 77 Issue 2, p39 

    Deals with concerns over dehumidification of outside air in schools. Reasons for the difficulty in addressing the effects of poor indoor-air in schools; Process of dehumidifying outside air; Overview of the process of subcooling supply air with a cooling coil.

  • CHAPTER 23: AIR-HEATING COILS.  // ASHRAE Handbook: Heating, Ventilating & Air-Conditioning Systems;2004, p23.1 

    Chapter 23 of the book "2004 ASHRAE Handbook: Heating, Ventilating and Air-Conditioning System and Equipment" is presented. It explores the air-heating coils which are used to heat air under forced convection. It also explains that coils consists of a primary and a secondary heat-transfer...

  • Humidification: Ensuring Operation. Wasner, Lynne; Nelson, Bob // Heating/Piping/Air Conditioning Engineering;Nov2005, Vol. 77 Issue 11, p58 

    Focuses on the approaches that should be taken to successfully operate a steam-humidification system. Factors that need to be considered in designing and operating a humidification system; Main control diagnostic issues that signal the incompatibility and improper placement of components;...

  • Don't Get HOT Under the Cabinet. Edwards, Kirk // Process Cooling & Equipment;Apr2012, p10 

    The article discusses the importance of providing vortex tube-based cabinet cooler systems with cool and clean environment to operate. It notes the advantages of using the system since they provide low cost and reliable way of cooling, as well as ease of installing. However, it advises to keep...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics