Crucible Materials to Upgrade Annealing, Heat Treating Facility

September 2005
Metal Center News;Sep2005, Vol. 45 Issue 10, p65
Trade Publication
Reports that Crucible Materials Corp. has launched a major capital program to install a new high-temperature furnace in the heat treat area at the company's facility in Syracuse, New York. Manufacturer of the furnace; Capabilities of the special tilt-furnace; Impact of the furnace's installation on the industrial productivity of the facility.


Related Articles

  • midrange saddlestitchers. McLean, Allison K. // American Printer;Aug2002, Vol. 229 Issue 5, p56 

    Focuses on the significance of midrange saddlestitcher installations to the printing industry in the U.S. Sources of midrange stitchers in the U.S.; Motivation for purchasing midrange stitchers; Function of the equipment on the pressroom floor of the printing firms. INSETS: Midrange stitcher...

  • Installations.  // American Printer;Jul2010, Vol. 127 Issue 7, p6 

    The article offers news briefs related to equipment installation by various printing companies in the U.S. including Mattoon, Illinois-based United Graphics Inc.; Kirkland, Washington-based Leatherback Printing; and New York-based the Standard Group Inc.

  • Doctor's Home Gets Top-Of-The-Line Treatment. Turpin, Joanna R. // Air Conditioning Heating & Refrigeration News;8/19/2002, Vol. 216 Issue 16, p14 

    Reports on MercAir's installation of a heating, ventilation and air conditioning (HVAC) system in a mansion owned by a doctor in Tampa, Florida, as of August 19, 2002. Design of the doctor's home; Features of the HVAC system installed by the contractor.

  • Texas Mansion Has Big Geothermal System. Turpin, Joanna R. // Air Conditioning Heating & Refrigeration News;8/19/2002, Vol. 216 Issue 16, p16 

    Reports on Geothermal Air Conditioning's installation of a heating, ventilation and air conditioning (HVAC) system in a mansion in Woodlands, Texas, as of August 19, 2002. Features of the HVAC system installed by the contractor; Factors which affected the installation.

  • JDM Sees SCS as its Future.  // Metal Center News;May2007, Vol. 47 Issue 6, p38 

    The article focuses on the $5 million coil-to-coil Smooth Clean Surface (SCS) processing line and inventory system installed at JDM Steel company in Chicago Heights, Illinois. The installation is seen as a means for JDM to specialize and capture an assuring niche in a consolidating steel market....

  • Quick- Step Launches 'Style My Floor' Digital Shopping Tool.  // Floor Trends;Sep2014, Vol. 16 Issue 9, p24 

    The article offers brief information on the Quick Step Style My Floor digital shopping application from Quick Step.

  • Rx for Instrumentation. Cleaveland, Peter // Control Engineering;Jun2006, Vol. 53 Issue 6, p48 

    Gives advice on the maintenance of field instrumentation in industrial plants. Devices needed to maintain process instrumentation; Factors to consider when installing equipment; Key advantages of leaving properly-working equipment as it is; Signs of equipment problems using process noise...

  • Installing Gas-Fired Infrared Heaters. Marklowitz, Cam // Heating/Piping/Air Conditioning Engineering;Aug2004, Vol. 76 Issue 8, p0 

    Presents tips on the proper installation of gas-fired infrared heaters. Requirements of general infrared installation common to all commercial, gas-fired equipment; Contents of a plan drawing upon selecting equipment for a job, the sizing and selection process; Possible outcome if the...

  • Installing Makeup-Air Units. Tinsley, Robert W. // Heating/Piping/Air Conditioning Engineering;Dec2004, Vol. 76 Issue 12, p43 

    Cites important factors and items to consider during the makeup-air unit installation process. Location; Diffuser sites; Gas-fired units; Disconnect switch location.


Read the Article


Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics