TITLE

Benefits of Building Integration

AUTHOR(S)
Turnbull, Paul G.
PUB. DATE
August 2005
SOURCE
Heating/Piping/Air Conditioning Engineering;Aug2005, Vol. 77 Issue 8, p8
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Discusses the benefits of designing buildings with various levels of system integration. ways to achieve single-seat monitoring; Reason programming and scheduling application minimizes training requirements for operators; Basis for designers to determine how much of the building's equipment needs to be controlled and how much additional control logic is required.
ACCESSION #
17968656

 

Related Articles

  • Who's on first.  // IIE Solutions;Nov2001, Vol. 33 Issue 11, p21 

    Presents an article about making an employee work schedule. Similarities between work and sports in terms of scheduling players or workers; Importance of cross training workers; Value of lineup changes.

  • Weather Permitting. Weitzel, Allen F. // Tourist Attractions & Parks;Nov2005, Vol. 35 Issue 7, p34 

    Offers insights for amusement park management staff on deciding whether to stay open or to close the facility due to weather condition. Importance of establishing a weather program and developing well-trained staff; Factors to consider in planning the operating hours; Significance of...

  • Using Virtual Construction Tools for Pre-Project Planning. Bailey, Jason K. // Professional Constructor: The Journal of the American Institute ;Apr2014, Vol. 38 Issue 1, p51 

    Preconstruction, or the set of activities that precedes the physical erection of a structure, is the keystone of the construction process that sets the stage for successful projects. This process has evolved from a meeting and a hand shake to a complex process involving teams of individuals...

  • Pre-Project Planning with Virtual Construction Tools "To Do More with Less". Tovar, Stephanie // Professional Constructor: The Journal of the American Institute ;Apr2014, Vol. 38 Issue 1, p62 

    The construction process has a historically weak productivity growth rate. Currently, market conditions and increasing client demands give constructors every incentive to strive for improvement. Project managers can make improvements in construction time, cost, and quality standards by...

  • Research for Global Coordinating Method of Large Equipment Scheduling in Construction Site. Ruojun, Yao; Guangwen, Ma; Lianghai, Jin // Discrete Dynamics in Nature & Society;10/11/2015, Vol. 2015, p1 

    Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For...

  • Minister to consider exemption for tool hire.  // PMJ: Plant Managers Journal;Mar2003, Vol. 30 Issue 3, p6 

    Deals with the plan of Great Britain Parliamentary Undersecretary of State for Education and Skills Ivan Lewis for the exemption of tool and non-operated plant hirers from the Construction Industry Training Board (CITB) training levy. Response of the CITB to Lewis; Implications to the other...

  • Debut for new Chelsea signing.  // PMJ: Plant Managers Journal;Mar2005, Vol. 32 Issue 3, p42 

    Reports on the utilization of a JCB mini excavator for the construction of Chelsea club's training centre in Surrey, England.

  • Evolving At Its Best. Diesing, Genevieve // Quality;Sep2013 Supplement, p14 

    The article discusses best practices in the vision technology industry. Automated Imaging Association (AIA) vice president Dana Whalls say that companies are trying to incorporate trainings for their personnel. It says that the System Integrator Certification program of the AIA helped vision...

  • Sustainable Value on a Smaller Scale. Stepanek, Laura // SDM: Security Distributing & Marketing;Nov2010, Vol. 40 Issue 11, p15 

    The article offers the author's insights on the company Siemens Security Solutions which won the 2010 Systems Integrator of the Year. The author says that Siemens was able to provide sustainable value to customers in the form of reliable consistency. The author mentions the Operational Readiness...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics