Do Patients with Different Psychiatric Diagnoses Require Different Strategies for Certifying Sick Leave? - First Indications from a Prospective Study

Tritt, Karin; Schneider, Helen; Bidmon, Robert K.; Nickel, Marius; Leiberich, Peter; Joraschky, Peter; Loew, Thomas H.
April 2005
Croatian Medical Journal;2005, Vol. 46 Issue 2, p308
Academic Journal
Analyzes the relationship between duration of prior certified sick leave and the course of psychiatric symptom severity in a prospective study. Health behavior of patients with psychiatric problems; Methodology of the study; Discussions of the results of the study.


Related Articles

  • Choosing screening instrument and cut-point on screening instruments. A comparison of methods. Søgaard, Hans J. // Scandinavian Journal of Public Health;Nov2009, Vol. 37 Issue 8, p872 

    Aims: This study analyzes decisive measures of efficiency of a test, receiver operating characteristic (ROC) analysis and QROC analysis combined with considerations about clinical, health-economic, and ethical aspects when choosing screening instruments. Methods: Analyses of Common Mental...

  • New policies needed to tackle workplace sickness absence.  // PharmacoEconomics & Outcomes News;5/7/2005, Issue 477, p5 

    Discusses research being done on long term sickness absence in the workplace. Reference to a study by M. Henderson and colleagues, published in the April 9, 2005 issue of the "British Medical Journal"; Increase in the contribution of psychiatric disorders to sickness absence; Conclusion of the...

  • Certification dilemmas. Winstock, Grant // GP: General Practitioner;9/29/2003, p39 

    There is an escape route from difficult requests. Patients occasionally present with a request for a letter to excuse them from attending court or claiming they were unable to attend work or college several days previously. Most of the requests for court letters were from young men with a...

  • Validation Study of a Distress Screener. Braam, C.; Oostrom, S. H. van; Terluin, B.; Vasse, R.; De Vet, H. C. W.; Anema, J. R. // Journal of Occupational Rehabilitation;Sep2009, Vol. 19 Issue 3, p231 

    Objectives A 3-item screening instrument called the Distress Screener was developed for early identification of distress among employees on sick leave. The Distress Screener consists of three items obtained from the distress subscale of the four-dimensional symptom questionnaire (4DSQ). This...

  • Is your employee genuinely sick? Dias, Katee // Caterer & Hotelkeeper;10/16/2009, Vol. 199 Issue 4599, p40 

    The article provides an answer to a question from a hotelier related to the sick leave of employees.

  • Four Steps to Evaluate Absence Policies. Weber, Teri // Risk Management (00355593);Mar2011, Vol. 58 Issue 2, p11 

    The article highlights ways to gauge the effectiveness of absence policies, which includes conducting a review of the policy, assessing the Family Medical Leave Act provisions of the company and being up-to-date with regulations.

  • Know your rights if ill on annual leave. Emin, David // Media Week;10/27/2009, Issue 1231, p19 

    The article presents a question and an answer related to canceling a leave and take the week as sick leave.

  • Q&A. Hannaford, Janet // Education (00131156);Feb2014, Vol. 95 Issue 1, p11 

    The article provides an answer to a question related to the rejection of sick leave application.

  • Q and A. Phil Ní Sheaghdha // World of Irish Nursing & Midwifery;Jun2015, Vol. 23 Issue 5, p51 

    No abstract available.


Read the Article


Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics