TITLE

Florida Agency to Offer Road Plan Including $188M of Bonds

AUTHOR(S)
Sigo, Shelly
PUB. DATE
November 2004
SOURCE
Bond Buyer;11/29/2004, Vol. 350 Issue 32018, p4
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports on the meeting of Tampa-Hillsborough County Expressway Authority with officials to present a finance plan that includes issuing of revenue bonds to fox portions of elevated road project in Florida. Evalution of proposal to pay back loan to the state Department of Transportation; Appointment of First Southwest Corp. as its financial adviser by the authority; Affirmation of the A minus rating on the authority's outstanding senior-lien revenue bonds bt Fitch Ratings.
ACCESSION #
15220583

 

Related Articles

  • Truck-only toll lanes set for Florida. Dunn, Jill // Overdrive;Apr2010, Vol. 50 Issue 4, p14 

    The article reports that the construction of the truck-only toll lanes of the Florida Department of Transportation (FDOT) is scheduled to begin by summer of 2013 in Florida.

  • One final puff. Bernos, Michael // Roads & Bridges;Aug2014, Vol. 52 Issue 8, p32 

    The article discusses how the Florida Department of Transportation (FDOT) undertook the reconstruction of highway I-4 to improve the traffic problem of Ybor City and to reestablish the district as a National Historic Landmark District. Topics discussed include how activities in the Port of Tampa...

  • More direct. Frank, Richard; Hines, Franklin // Roads & Bridges;May2012, p42 

    The article features the Connector or the I-4/Selmon Expressway Interchange in Tampa, Florida. The Connector project is part of the enhancements identified in the Tampa Interstate Study/Final Environmental Impact Statement. It was designed by the Florida Department of Transportation (FDOT),...

  • CREATING A TOOL FOR PLANS-TO-GO.  // ENR: Engineering News-Record;12/24/2001, Vol. 247 Issue 26, p39 

    Reports the development of an electronic system for the distribution plans of state highway projects by the Department of Transportation in Florida. Upgrade composition of the Professionals' Electronic Data Delivery System (PEDDS); Evaluation on the integrity of PEDDS; Efficacy of PEDDS.

  • Ideas diverge for road plan to connect University Circle. Bennett, David; Bullard, Stan // Crain's Cleveland Business;12/24/2001, Vol. 22 Issue 52, p4 

    Reports on the diverging ideas for road planning in Cleveland, Ohio. Opposition of Mayor-elect Jane Campbell to a proposed University Circle freeway; Study made for the construction of a boulevard or road; Improvement of the connection of the highway system to the University Circle.

  • Campo to vote on controversial SH 45 road plan. Biundo, Jen // Hays Free Press (Buda, TX);10/3/2007, Vol. 104 Issue 26, p2A 

    The article reports that the Capital Area Metropolitan Planning Organization (CAMPO) will vote on the State Highway 45 Southwest road plan.

  • Florida Agency Fires Director Who Pushed Ill-Fated Road Project. Sigo, Shelly // Bond Buyer;10/28/2004, Vol. 350 Issue 31999, p3 

    The article presents information that the Tampa Hiltsborough Expressway Authority fired its executive director on Monday and now is trying to figure out how to proceed with its bond-financed, elevated road project, which is literally sinking into Florida's sandy soil. The three-lane elevated...

  • Florida DOT Seeks Proposals for State's First Private Tolled Expressway. Sigo, Shelly // Bondbuyer.com;9/ 9/2013, p10 

    The article calls for competitive proposals for the first privately operated tolled expressway by the Florida Department of Transportation between Newport Richey and Zephyrhills in Florida due on October 9, 2013. The winning bidder will finance, design and build a 33-mile-long, east-west route...

  • Public-private partnership to rebuild I-4 near Orlando. Quinn, Matthew W. // American City & County Exclusive Insight;9/16/2014, p1 

    The article provides information on the rebuilding of Interstate Four highway in urban Orlando by the Florida Department of Transportation (FDOT). The project named "I-4 Ultimate Improvement Project" is a 2.3 billion dollars deal which is expected to take six and a half years, and the...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics