TITLE

The Bogey of Excess Capacity

PUB. DATE
April 1941
SOURCE
New Republic;4/7/41, Vol. 104 Issue 14, p459
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Discusses about the problem of excess capacity which may be faced by the U.S. after demobilization. Apprehension that after demobilization the demand of defense products may come down rapidly; Argument that in case Axis wins U.S. shall not be able to demobilize at all; Suggestion that the government should concentrate on useful products like housing, roads, conservation and other public works; Suggestion that monopoly power to restrict output or maintain prices can be curbed by anti-trust action or otherwise; Apprehension that taxes Will be greatly increased to help finance defense expenditure.
ACCESSION #
14705788

 

Related Articles

  • PUBLIC WORKS.  // Governing;Jan2002 Source Book, Vol. 15 Issue 4, p77 

    Presents the ranking of state and local spending for several aspects of public works in the U.S. as of 2002. Highway spending; Roads and streets; Public transit; Parks and recreation spending; Spending on housing.

  • SAFETEA-LU Remains On Course, Generally. Ichniowski, Tom // ENR: Engineering News-Record;11/28/2005, Vol. 255 Issue 21, p10 

    This article reports that authorizers grabbed the early spotlight as the U.S. House Transportation and Infrastructure and Senate Environment and Public Works Committees finally moved the first multi-year transportation measure since 1998. The Safe, Accountable, Flexible, Efficient Transportation...

  • Integrated coastal management in the Venice lagoon and its watershed. Suman, Daniel; Guerzoni, Stefano; Molinaroli, Emanuela // Hydrobiologia;Nov2005, Vol. 550 Issue 1-3, p251 

    The Venice Lagoon (VL) is a complex ecosystem in which public participation and area-based management has often been neglected by administrative bodies involved in the planning of coastal projects and public works. In this area, the analysis of the local situation highlighted a substantial...

  • Managing public agency conflict: Why do public works projects get stalled by conflicts with other public agencies? Busch, William L. // Journal of Public Works & Infrastructure;Dec2008, Vol. 1 Issue 3, p269 

    Ask most seasoned public agency professionals what their most difficult negotiation has been and it will often be a case involving some other public agency. This paper explores why public agencies have such a difficult time dealing with one another and describes the forces that create tensions...

  • Equipment Puzzler.  // Commercial Carrier Journal;Oct2007, Vol. 164 Issue 10, p33 

    The article presents the answer to a question on tire sipes. Jim Dunn, superintendent for the Department of Public Works in the Village of Dobbs Ferry, New York, explained that sipes are cuts or slots in a tire tread that help with traction in snow and mud. Sipes also help to disperse heat. A...

  • GOVERNMENT GEAR.  // American City & County;Sep2012, Vol. 127 Issue 9, p43 

    The article offers information on products for public works projects which include the Power-V XT Plow from Boss Snowplow, the PK-100 walk-behind spreader from PK Products and the SuperMaxx series spreaders from SnowEx.

  • Here's Hoping Schwarzenegger Won't Deliver a Bond Bombshell. McClintock, Tom // San Diego Business Journal;2/13/2006, Vol. 27 Issue 7, p38 

    The article comments on Pat Brown's administration of public works construction in California. During those years, California had built the finest highway system in the world and the foremost university system in the country. However, by the end of his administration, the state had a 711 million...

  • Constructive Acceleration: Waking the Sleeping Giant. Peters, Thomas F. // Cost Engineering;Jun2005, Vol. 47 Issue 6, p16 

    "Death by 1,000 cuts!" It's the total cost claim battle cry, long uttered by contractors in their attempts to assign total project loss to the owner. And why not? After all, the total cost method was quick, simple and inexpensive to apply - until Amelco effectively crushed it for California...

  • Getting the drift. Florquist, Bruce // American City & County;Sep2006, Vol. 121 Issue 10, p28 

    This article offers advice to public works agencies on snow and ice control planning. In planning for winter weather, public works directors must prepare three primary elements, policies, operations and education. The most effective policies are those that are adopted by the community's...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics