TITLE

Major underwater pipeline planned

PUB. DATE
November 1997
SOURCE
Underground Construction;Nov97, Vol. 52 Issue 11, p10
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Details the underwater pipeline project of the North Atlantic Pipeline Partners LP spanning the northern area of the United States and Canada. Proposed length of the pipeline.
ACCESSION #
1163746

 

Related Articles

  • 5-Year Pending Pipeline Construction Plans. Nutter, Mark // Underground Construction;Jan2000, Vol. 55 Issue 1, p28 

    Provides data concerning the worldwide pipeline construction market. Project of Aspen Products Pipeline LLC; Study being conducted by North Atlantic Pipeline Partners L.P.; Scope of the work of Shell Philippines Exploration BV.

  • Saipem joint venture work nears completion in Thailand.  // Pipeline & Gas Journal;Sep95, Vol. 222 Issue 9, p14 

    Reports that the Semac 1 semi-submersible laybarge is completing installation of a subsea pipeline which will carry natural gas from the Erawan Field ERP Platform to an onshore gas receiving terminal south of Bangkok, Thailand.

  • Rocky road to Mongstad for Troll pipeline engineers. Breivik, J.; Bruschi, R. // Offshore;Aug95, Vol. 55 Issue 8, p64 

    Reports on the challenges faced by project engineers in laying the Troll Oljeror pipeline on the Norwegian shelf. Location; Phases of the pipeline development; Pipeline route stages; Soil condition; Monitoring of the current regime in the Fensfjorden; Seabed topography.

  • Accurate pipeline wall inspection.  // Offshore;Aug95, Vol. 55 Issue 8, p202 

    Features RTD's motor-driven subsea pipeline inspection tools (PIT). Power source; Deployment.

  • The expected impact of the �Peace Conduit� project (the Red Sea - Dead Sea pipeline) on the Dead Sea. Ittai Gavrieli; Amos Bein; Aharon Oren // Mitigation & Adaptation Strategies for Global Change;Oct2005, Vol. 10 Issue 4, p759 

    The Dead Sea is a severely disturbed ecosystem, greatly damaged by anthropogenic intervention in its water balance. During the 20th century, the Dead Sea level dropped by more than 25 meters, and presently (2003) it is at about 416 meters below mean sea level. This negative water balance is...

  • Hybrid composite/duplex line pipe brings huge increase in tensile strength.  // Offshore;Oct96, Vol. 56 Issue 10, p121 

    Describes the Design Unique System (DUS), a method for using composite materials in the construction of line-pipe for handling sour liquids for the offshore industry. Schedule of completion of the method; Cost-effectiveness; DUS equipment requirements; Interest of Statoil and Norsk Hydro on the...

  • Interconnector Latest Link In European Gas Market Integration.  // Pipeline & Gas Journal;Nov98, Vol. 225 Issue 11, p36 

    Focuses on the sub-sea pipeline UK-Continent Gas Interconnector that connects the Great Britain national gas transmission system with that of continent Europe. Information about the inauguration ceremony of the Interconnector; Comments of European Energy Commissioner on significance of the...

  • P126-M Boracay water pipeline inaugurated.  // Filipino Reporter;4/5/2012, Vol. 40 Issue 18, p35 

    The article reports that Philippine Tourism Secretary Ramon Jimenez led the inauguration of a submarine water pipeline built by Boracay Island Water Co. (BIWC) along the Caticlan-Boracay channel to augment the existing 13-year-old pipeline supplying water to Boracay from mainland Malay town.

  • Pipelayer sets angle of delivery.  // Professional Engineering;02/26/97, Vol. 10 Issue 4, p44 

    Reports on a subsea pipelaying method. Diversion of pipeline from original horizontal line on pipelaying vessel; Attachment of pre-bent length of pipe to edge of pipeline; Detachment of cable prior to start of pipelaying on to the seabed; Arrangement of launch angle.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics