TITLE

BRAIN TEASER

PUB. DATE
August 2003
SOURCE
Engineer (00137758);8/29/2003, Vol. 292 Issue 7634, p42
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Presents a quiz on engineering focusing on reservoir planning.
ACCESSION #
10815831

 

Related Articles

  • 130G Grader...  // PS: Preventive Maintenance Monthly;Apr99, Issue 557, p23 

    Presents tips on how to gain accurate reading from the hydraulic oil reservoir. Set-up of 130G grader on hydraulic lines; Safety precautions.

  • Supervision system adds subsea controls to optimize production.  // Offshore;Feb98, Vol. 58 Issue 2, p42 

    Highlights the Active Reservoir Management System (ARMS), an intelligent completions technology developed by ABB Seatec, Dresser Oil Tools and Sperry-Sun Drilling Services. Features of ARMS; Performance of ARMS in ultra-long subsea tiebacks; Discussion of three completion scenarios varying in...

  • Trials suggest harsh environment subsea trees are feasible. Fenton, Steve // Offshore;Sep98, Vol. 58 Issue 9, p134 

    Reports on the feasibility of subsea trees in harsh environments according to trials in a number of high pressure/high temperature projects in the gas condensate reservoirs in the Central Graben region. ABB Vetco Gray's subsea hardware development program; 3D finite element analysis on the...

  • Proper oil, water atomization needed for burner combustion. Young, Tim // Offshore;Jun96, Vol. 56 Issue 6, p52 

    Discusses oil and water atomization in burner combustion in oil reservoir operations. Need for operators to atomize crude oil into fine droplets for efficient flaring; Use of a modular burner system; Use of production flow tests; Combustion process; Burner nozzle formation; Burner operation.

  • Ten Billion Gallons a Day. Sass, Herbert Ravenel // Saturday Evening Post;1/6/1951, Vol. 223 Issue 28, p24 

    The article focuses on a new engineering project in Charleston, South Carolina that would build a huge water reservoir. The expected amount of water to be provided by the project is 2,500,000,000 gallons per day. The cost of the project is $6,000,000. It is said that the Santee-Cooper River will...

  • Adding molasses to or removing sulfates from injected seawater. Le Blanc, Leonard // Offshore;Sep97, Vol. 57 Issue 9, p34 

    Focuses on issues associated with the injection of seawater into oil reservoirs. Description of the fluids resident in an oil and gas reservoir; Benefits of priming of injection fluids with molasses; Issues that scientists should consider regarding injection fluids.

  • Isolate reservoirs during underbalanced operations. Hartley, Frank // Offshore;Jun2002, Vol. 62 Issue 6, p90 

    Provides information on the use of subsurface safety valves (SSV) to isolate oil and gas reservoirs during underbalanced operations of offshore oil and gas fields. Function of the Halliburton Quick-Trip valve; Details of its well design considerations; Cost-effectiveness of the valves.

  • PanCanadian plans its biggest investment yet.  // Alberta Report / Newsmagazine;07/07/97, Vol. 24 Issue 30, p21 

    Reports on a five-year project to enhance recovery from the Weyburn oilfield in southern Saskatchewan. The 69% interest held by PanCanadian Petroleum Ltd. of Calgary, Alberta; Expense figures; Pipeline logistics; Forecasts for enhanced production in barrels per day.

  • Cylindrical reservoir breaks from convention. Hitchcox, Alan // Hydraulics & Pnuematics Exclusive Insight;5/ 7/2012, p18 

    The article evaluates the Cyclone cylindrical reservoir for hydraulic fan drives in mobile equipment, from Price Engineering.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics