TITLE

Reactor Vessel Inspections

PUB. DATE
May 2003
SOURCE
Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p16
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports on a remotely operated manipulator system scheduled for introduction in the spring of 2003 by Framatome ANP for ultrasonic examinations of pressurized water reactor (PWR) vessels. Features of the manipulator called the Trans-World Reactor Vessel Examination System (TWS).
ACCESSION #
10016066

 

Related Articles

  • Nuclear rebirth. Russell, Eric // International Power Generation;Nov2005, Vol. 28 Issue 6, p13 

    This article takes a look several state-of-the art nuclear power reactors being developed as of November 2005. Framatome is building its first European Pressurized Water Reactor in Finland which features innovations designed to prevent core meltdown. Meanwhile, GE Energy is also developing its...

  • FRAMATOME ANP DEVELOPING HANFORD WASTE TREATMENT EVAPORATORS.  // Industrial Environment;Sep2003, Vol. 14 Issue 9, p3 

    Reports on a contract awarded by Bechtel National Inc. to Framatome ANP to design, analyze and fabricate evaporator systems in support of the Waste Treatment Plant Project at the U.S. Department of Energy's Hanford Reservation near Richland, Washington.

  • Optimistic About the Future. Cook, Andrew // Nuclear Plant Journal;Jul/Aug2003, Vol. 21 Issue 4, p41 

    Forecasts business strategies planned by Framatome ANP Inc. Progress of the company's involvement in the turbine business; Explanation of the firm's flagship product and service; Extent of the company's commitment to research and development. INSET: Andrew Cook..

  • Nuclear Market�An Extraordinary Opportunity. Christopher, Thomas // Nuclear Plant Journal;May/Jun2002, Vol. 20 Issue 3, p46 

    Comments on the operation of the nuclear power plant Framatome ANP Inc. in the U.S. Factors that influenced the acquisition of the Duke Engineering & Services; Shortage of skilled outage workers; Excellence in outages.

  • First nuclear refueling outage completed in Brazil.  // Power;Sep2002, Vol. 146 Issue 6, p5 

    Reports on the completion of a comprehensive service of Brazilian nuclear power plant, Angra-2 by Framatome ANP. Features of the plant; Maintenance of the plant.

  • Record Time.  // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p16 

    Reports on the record time in which Framatome ANP performed fuel replacement activities during a scheduled refueling outage at Daya Bay nuclear power plant. Framatome ANP as an AREVA and Siemens company; Supply of a fresh vessel head to the plant by Framatome ANP.

  • TELEPERM: An I&C Solution to Improve Plant Performance. Lochner, Karl-Heinz // Nuclear Plant Journal;Sep/Oct2002, Vol. 20 Issue 5, p30 

    Interviews Karl-Heinz Lochner, vice president of Nuclear Instrumentation and Controls (I&C) in Framatome ANP Inc. regarding use of TELEPERM I&C solution for nuclear power plants. Explanation for justifications for instrumentation and control modernization in nuclear industry; Impact of the...

  • Switzerland's Beznau completes digital controls upgrade.  // Power;Aug2002, Vol. 146 Issue 5, p4 

    Reports on the completion of the retrofit of a Teleperm XS system of Beznau's nuclear power station in Switzerland, supplied by Framatome ANP Inc. Comments from Doctor Urs Weidmann, head of the Electrical Department at Beznau; Essential factor to assuring the safe and reliable operation of...

  • Framatome acquires Duke E&S.  // Modern Power Systems;May2002, Vol. 22 Issue 5, p9 

    Reports the acquisition of Duke Engineering & Services by Framatome ANP in the U.S.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics