TITLE

Perry Plant Refuels

PUB. DATE
May 2003
SOURCE
Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p6
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports on FirstEnergy Nuclear Operating Co.'s regularly scheduled refueling outage of the Perry Nuclear Power Plant in Perry, Ohio starting on April 5, 2003. Task of replacing 280 of the 748 fuel assemblies in the reactor core; Modifications to the turbine, the diesel generator and cooling water systems.
ACCESSION #
10015937

 

Related Articles

  • Beaver Valley in Service.  // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p6 

    Reports on FirstEnergy Nuclear Operating Co.'s announcement that Unit 1 of the Beaver Valley Power Station returned to service on April 29, 2003 following a scheduled refueling that began on March 8, 2003. List of activities undertaken in the process; Modifications and upgrades to various pumps...

  • Confrentes sets outage record. Chambers, Ann // Power Engineering;Nov96, Vol. 100 Issue 11, p30 

    Reports that the CN Confrentes station, a Spanish nuclear power plant, have successfully establish a world record of 19 days and 15 hours refueling outage for a modern General Electric (GE)-supplied boiling water reactor. Implementation of an alternate outages in 20 to 49 days; First spanish...

  • AREVA continues fuel delivery to FirstEnergy nuclear plant.  // Engineer (Online Edition);3/28/2012, p5 

    The article focuses on the extension of the fuel fabrication contract of FirstEnergy Nuclear Operating Co. with AREVA for the continued fuel delivery to the Davis-Besse nuclear powerstation in northwestern Ohio.

  • Hooked on nukes. Ford, Tom // Crain's Cleveland Business;04/19/99, Vol. 20 Issue 16, p1 

    Reports on the continued growth of Akron, Ohio-based nuclear-power firm FirstEnergy Nuclear Operating Co. despite doubts about its financial viability. Ownership of four nuclear reactors; Generation of 34 percent of its power from nuclear energy in 1998; Description of nuclear operations;...

  • FirstEnergy Nuclear Operating Company Names Michael J. Yeager Director, Technical and Lab Services.  // TendersInfo News;5/30/2015, p1 

    The article announces appointment of Michael J. Yeager as director of Technical and Lab Services at BETA Laboratory in Mayfield, Ohio, which is owned by FirstEnergy Nuclear Operating Co.

  • Bolts to contribute to record outage.  // Power Engineering;Jan96, Vol. 100 Issue 1, p41 

    Features the Pilgrim Radial Fit Bolts, which contributed to the refueling outage record at the Limerick Generating Station by Peco Energy Co. Time saved in the installation of bolts; Combination feature of the Pilgrim bolts.

  • Roosevelt Completes Overhaul, Refueling.  // Defense Daily;8/30/2013, p1 

    The Navy yesterday completed the mid-life nuclear refueling and overhaul of the USS Theodore Roosevelt (CVN-71) aircraft carrier. The USS Theodore Roosevelt (CVN-71). Photo byÂ…

  • Record Time.  // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p16 

    Reports on the record time in which Framatome ANP performed fuel replacement activities during a scheduled refueling outage at Daya Bay nuclear power plant. Framatome ANP as an AREVA and Siemens company; Supply of a fresh vessel head to the plant by Framatome ANP.

  • Beaver Valley Repairs Nozzles.  // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p6 

    Reports on the plan of FirstEnergy Nuclear Operating Co. to repair minor surface flaws on four of the 65 control rod drive mechanism nozzles at the 821-megawatt Beaver Valley Nuclear Power Station Unit 1 located in Shippingport, Pennsylvania. Weld repair designed to continued safe and reliable...