TITLE

SOMMARI

PUB. DATE
December 2012
SOURCE
Mediterranea - Ricerche Storiche;dic2012, Issue 26, p619
SOURCE TYPE
Academic Journal
DOC. TYPE
Abstract
ABSTRACT
No abstract available.
ACCESSION #
86439190

 

Related Articles

  • PIER GIUSTO JAEGER STORICO. Pescosolido, Guido // Mediterranea - Ricerche Storiche;dic2012, Issue 26, p431 

    The study outlines the historical writings of Pier Giusto Jaeger, distinguished scholar of commercial law, university professor and top-level manager in public administrations whose pure and genuine passion led him to become also a great historian. Jaeger's first and predominant vocation was...

  • Back to bells and cells? Russell, J.S. // Architectural Record;Sep1988, Vol. 176 Issue 10, p100 

    Interview. Three architects, Earl Flansburgh, Bill Brubaker, and Paul Kennon, each with several decades of school-design experience and each a respected innovator in the field, discuss the ways in which planning for primary and secondary education has changed since the 1960s and 1970s.

  • A new school of thought. Patterson, Maureen // Buildings;Sep98, Vol. 92 Issue 9, p74 

    Discusses the innovation on modern educational facilities in the United States. High technology equipments in some schools; Changes in teaching methods; Challenge in providing the technologies. INSETS: Worst fears realized;Gotta get the money;Facilities that work.

  • Monuments to reform. Harp, Lonnie // Education Week;4/3/96, Vol. 15 Issue 28, p18 

    Highlights the features and designs of a new generation of schools in the United States. Important aspects of school-building programs; Factors that govern school architects in their design; Adaptation to expanding technology; Incorporation of natural surroundings and settings; Emphasis on...

  • Uncommon commons.  // American School & University;Oct94, Vol. 67 Issue 2, p14 

    Reports on the commencement of the construction of a 2,000-student high school for the Tucson Unified School District in Arizona. Design features; School facilities; Schedule of completion.

  • Building without a plan.  // American School & University;Dec94, Vol. 67 Issue 4, p12 

    Focuses on the state requirement of master plans for schools in the United States planning to design and construct new facilities.

  • Regional construction activity shifts. Abramson, Paul // American School & University;May95, Vol. 67 Issue 9, p2a 

    Presents information concerning education construction in the United States by region. New school buildings for 1994; Cost, size and shape of new schools; Education construction spending by region. INSET: Technology initiative..

  • From college to grade school.  // American School & University;Oct95, Vol. 68 Issue 2, p16 

    Reports on the renovation of a building at the University of Massachusetts to become the Boston Renaissance Charter School, the largest charter school in the United States. Design and architecture.

  • What makes outstanding projects.  // American School & University;Nov96, Vol. 69 Issue 3, p14 

    Enumerates criteria for the `American School and University' journal's `Architectural Portfolio' awards for school design in the United States.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics